Quality. Service. Integrity.

Palace of Westminster (Cold Water Replacement)

Project Type: Boosted Cold Water System Replacement
Year: 2023
Value: £955,000

This job involved replacing and refitting the palace’s boosted cold water system to ensure a constant supply of pressurised water throughout the building.

The project spec included:

  • Developing all the required design works and gaining full sign-off through the Design Authority
  • Fabricating (at shop and onsite) and installing 1520m of galvanised tray work, which was fitted horizontally and vertically throughout the premises
  • Sequentially removing the existing equipment in each of the 4 tank rooms
  • Installing new boosted cold water systems in these 4 tank rooms
  • Carrying out BMS works
  • Testing and commissioning (following the full ATP process)

Timeframes were tight, but our team ensured the replacement system was handed over on time.

Whatever you want to achieve, L&B can help.

Contact us to discuss your needs in more detail. We’ll take the time to understand your environment before offering a bespoke solution that covers all bases.