Our team were appointed to undertake the replacement of the water fed LTHW pumps in 12 plant rooms at the Palace of Westminster.
Project elements included:
- Initial validation
- Sequentially removing the existing pumps
- Developing all the required design works and gaining full sign-off through the Design Authority
- Fabricating (at shop and onsite) and installing new pipework
- Supplying and installing all valves and pumps and associated electrical equipment and containment
- Carrying out BMS works
- Testing and commissioning (following the full ATP process)
- Insulating all systems
The works were carried out to a strict programme over the summer months and were handed over on time.